DOCUMENTATION
IN PROGRESS

Read the spec, then tell us where it breaks

Written alongside the protocol. DRAFT sections are open for comment; PLANNED sections are outlines. Nothing here is fielded.

01 / QUICKSTART

Shortest path to a round trip

TARGET — NOT YET FUNCTIONAL
$ meshlink init --callsign GW --radio /dev/ttyUSB0 --chan 915.0
$ meshlink policy add N4 --allow '?Q' --corpus routes --budget 512/40/200
$ arns agent up --model ./local.gguf --corpus ./corpus
# from the EUD
AOM:1 N4>GW ?Q RTE42 PASSABLE
02 / SECTIONS

What exists and what does not

FRAME FORMAT Header, verb set, payload ceilings per spreading factor. DRAFT
SESSION MODEL Acknowledgement, fragment numbering, timeouts, closure. DRAFT
TASKING POLICY Callsigns, task lists, budgets, rate limits. DRAFT
KEY KEYS Loading keys in the field with no network. Unsolved. PLANNED
CONFORMANCE The suite an implementation must pass to claim AOM. PLANNED
FIELDING GUIDE Channel planning, duty cycle, retrans siting. PLANNED
CONTACT

Found a hole?

That is what a draft is for. Send the case it fails on.

READ THE SPEC